KR152098 Nurmes, Signalling systems and High-voltage work

Location: Nurmes

Client: Destia Rail / Finnish Transport Agency

Description: The project included the installation of the track circuits for a renovated track sections and railroad switches. Railroad switch installations , automatic train protection (ATP) installations and heating element installations for switches. The planning phase for the signalling system and high-voltage work included measurements and final documentation.

Duration: 3 months.

Date of completion: 11/2015