Location: Nurmes
Client: Destia Rail / Finnish Transport Agency
Description: The project included the installation of the track circuits for a renovated track sections and railroad switches. Railroad switch installations , automatic train protection (ATP) installations and heating element installations for switches. The planning phase for the signalling system and high-voltage work included measurements and final documentation.
Duration: 3 months.
Date of completion: 11/2015